Tuesday, August 10, 2010

1st Meet

Now, we have a new assignment that take around 2 month to do it. That is by a group of 3 people, we need to built a bamboo dome that can float our group(3 people). Then we need to prefabricated our material and can be assemble in 30min. So the first step we do is meeting with my group member a have a rough idea on what we wan built.




No comments:

Post a Comment